Kokoulin I.Ye. Readiness of mine to emergency situations and conception of «zero risk»
- Details
- Parent Category: Geo-Technical Mechanics, 2022
- Category: Geo-Technical Mechanics, 2022, Issue 161
Geoteh. meh. 2022, 161, 127-137
https://doi.org/10.15407/geotm2022.161.127
READINESS OF MINE TO EMERGENCY SITUATIONS AND CONCEPTION OF «ZERO RISK»
1Kokoulin I.Ye.
1Institute of Geotechnical Mechanics named by N. Poljakov of National Academy of Sciences of Ukraine
UDC 622.8.012.2:622.831.325:622.8/
Language: English
Abstract. Unfortunately, emergency is an inherent feature of any dangerous manufacturing entity, what a coal mine is. A plenty of harmful and dangerous mining, geological and technogeneous factors with high risk of emergency occurrence acts in the mines. Therefore, personnel should be ready to reveal and eliminate such situations as soon as possible with no human losses and minimum economic damage. Conception of «zero risk» is useless for emergency situations, and minimization of «acceptable risk» is possible only on condition of correct organization of joint work of the system of against emergency protection (SAEP), plans of warning and elimination of emergencies. Today, maximum attention is paid to the liquidation of already happened failures. At the same time, most emergencies occur exactly by virtue of the fact that workers do not know or incorrectly interpret requirements of safety regulations established for the coal mines, or are not thoroughly familiar with priority actions on revealing the emergencies and requirements of the labour management system, though heavy consequences of emergencies are caused by incorrect actions of personnel or its inability to use current recommendations and the SAEP facilities. Therefore, in this work, we describe basic methodical approaches to creation and use of the first constituent of the SAEP system: preparation of its elements and training of workers on how to use them. In this article, we consider such issues as control of risk factors, specifying of measures for controlling unforeseen situations or emergencies, developing of principles for organizing work of the trouble crew, providing the personnel with necessary equipment and materials and training of methods for revealing, limitation and warning about the emergency occurred and actions to be undertaken during mobilization, deployment of special systems and after elimination of the emergency, as well as estimation and improvement of the whole system operation through the regular surveys and tests. It is concluded that readiness of personnel to the actions in emergency situations is ensured by integration of all necessary elements including creation of safety service, providing it with high-fi special equipment and regular reviews of efficiency of actions undertaken by this service.
Keywords: emergency situation, dangerous factor, coal mine, readiness to the emergency, zero risk, possible risk.
REFERENCES:
1. Statutory Committee of Ukraine on the Supervision after a Labour Protection (1999), Polozhennya shchodo rozrobky planiv lokalizatsii ta likvidatsii avariynykh sytuatsiy I avariy [Position in relation to development of plans of localization and liquidation of emergency situations and failures], Kyiv, UA.
2. Ministry of Coal Industry of Ukraine (2010), NPAOP 10.0-1.01-10 Pravyla bezpeky u vugilnykh shakhtakh [NLASL 10.0-1.01-10 Rules of safety in coal mines], Osnova, Kiev, UA.
3. Statutory Committee of Ukraine on the Supervision after a Labour Protection (1996), DNAOP 1.1.30-5.17-96: Instruktsiya zi skladannya planiv likvidatsii avarii [SNALP 1.30-5.17-96: Instruction from drafting of plans of liquidation of emergencies], Kyiv, UA.
4. Potemkin V.Ya, Kozlov YeA. and Kokoulin I.Ye. (1991), Avtomatizatsiya sostavleniya operativniy chasti planov likvidatsii avariy na shakhtakh I rudnikakh [Automation of drafting of operative part of plans of liquidation of emergencies on mines and ore mines], Tekhnika, Kyiv, UA.
5. Kazakov B.P., Kruglov Yu.V., Isaevich A.G. and Levin L.Yu. (2006), «Development of the programmatic-calculable complex «Aeronetwork» for the calculation of vent networks of mines and ore mines», Mine information-analytical bulletin. Thematic supplement «Aerology», pp. 21-32.
6. Kravchenko N.M. (2001), «New computer technology of decision of tasks of labour protection and accident prevention», Coal, no. 8, p/ 40.
7. Rukovodstvo po ekspluatatsii programmnoy sistemy REVOD. Versiya 4.2 [Guidance on exploitation of the programmatic system REVOD. Version 4.2] (1999), Academy of mine sciences of Ukraine, Donbass scientific center, Donetsk, UA.
8. Gryadushchyi B.A., Dubov Ye.D., Mukhin Ye.P. [and others] (2009), Polozhennya zi skladannya planiv poperedzhennya avariy: galuzevyi normatyvno-metodychnyi dokument [Regulation from drafting of plans of warning of emergencies: branch normatively-methodical document], SE «DonVUGI», Donetsk, UA.
9. Kokoulin I.Ye., Eashchenko I.A. and Klimenko A.A. (2016), “System of collective rescue of miners in case of occurring of accidents in a coal mine”, Geo-Technical Mechanics, no. 139, pp. 166-179. https://doi.org/10.15407/geotm2018.02.166
10. Metodika proverki gotovnosti shakht k soglasovaniiu planov likvidatsii avariy [Methodology of verification of readiness of mines to the concordance of plans of liquidation of accidents] (1980), Moscow, SU
About author:
Kokoulin Ivan Yevhenovych, Candidate of Technical Sciences (Ph.D.), Senior Researcher, Senior Researcher in Department of Problems of Mineral Mining at Great Depths, Institute of Geotechnical Mechanics named by N. Poliakov of National Academy of Sciences of Ukraine (IGTM NAS of Ukraine), Dnipro, Ukraine, This email address is being protected from spambots. You need JavaScript enabled to view it.