Imashev A., Kebal Ya., Kebal A. Problems of dumping technology in the inundated open pit space in conditions of surface deformation
- Details
- Parent Category: Geo-Technical Mechanics, 2022
- Category: Geo-Technical Mechanics, 2022, Issue 162
Geoteh. meh. 2022, 162, 144-153
https://doi.org/10.15407/geotm2022.162.144
PROBLEMS OF DUMPING TECHNOLOGY IN THE INUNDATED OPEN PIT SPACE IN CONDITIONS OF SURFACE DEFORMATION
1Imashev A., 2Kebal Ya., 2Kebal A.
1Abylkas Saginov Karaganda Technical University, 2KAI Group of Companies
UDC 622.271.3
Language: English
Abstract. Challenge. The objective of this research is to determine the minimum permissible safety berm for loading and mining equipment operation, ensuring safe and efficient dumping under the shear in recent dumping, subsidence of dump rock mass and fractures.
Research methods. Analytical and statistical analyses of the previously obtained results, simulation modeling, and in situ surveys of the research object were performed.
Scientific originality. Depending on the working progress, the dumping mode is specified for inundated slopes. The dependence of the stability factor on the safety berm size is specified. According to theoretical research results, the components of the forces acting on the slickensided surface are obtained.
Practical implications. Residual volumes of rock storage under the current technology using the available equipment were determined by calculations. Geomechanical analyses were conducted to determine the minimum permissible safety berm for loading and mining equipment. They revealed the dependence of stability factor on the size of the safety berm and identified that the minimum permissible safety berm for loading and mining equipment under the dumping conditions in the inundated open pit No. 1 of ArcelorMittal Kryvyi Rih PJSC with a standard stability factor (SF) (1.15) is 34 meters. The obtained results prove the possibility of using the existing equipment and applying the dumping technology in the rock deformation mode, subject to developing technological schemes ensuring safe and efficient dumping. For further dumping using the available equipment in the mined space of inundated open pit No. 1, it is required to perform research to determine safety zones or develop alternative ways and technologies of waste rock storage in open pit No. 1 applying the available equipment reducing the dumping cost and increasing the efficiency of using residual mine workings.
Keywords: inundated open pit, dumping, internal dump, shears, deformations, slope stability, excavator, sliding wedge, stability factor, K–MINE.
REFERENCES
1. Mogilevsky, A.L., Nikolashyn YU.M., Paly D.S. and Bilenko, A.E. (2010) “Reclamation of mountain quarries in difficult mining conditions“, Visnyk KTU, no. 25. pp. 58–62.
2. Ministry of Industrial Policy of Ukraine (2007), SOU–N MPP 73.020–078–1:2007. Normy tekhnolohichnoho proektuvannia hirnychodobuvnykh pidpryiemstv iz vidkrytym sposobom rozrobky rodovyshch korysnykh kopalyn. Chastyna 1. Hirnychi roboty. Likvidatsiia hirnychodobuvnykh pidpryiemstv. Tekhniko–ekonomichna otsinka ta pokaznyky [SOU–N SOU–N MPP 73.020–078–1:2007. Norms of technological design of mining enterprises with an open method of development of mineral deposits. Part 1. Mining works. Liquidation of mining enterprises. Technical and economic assessment and indicators], Ministry of Industrial Policy of Ukraine, Kyiv, Ukraine.
3. Nikolashyn YU.M (2010) “Zakliuchenye po obosnovanyiu uslovyi bezopasnoho skladyrovanyia vskrishnikh porod v otrabotanniy karer HOKa“ [Conclusion on the substantiation of the conditions for the safe storage of overburden in the finished quarry of the mining and beneficiation plant], NOVOTEK, Kryvyi Rih, Ukraine.
4. Drizhenko A.YU. (2014) “Technology of internal dumping in worked out deep iron ore quarries or their sites “, Innovatsionnyye tekhnologii i proyekty v gorno–metallurgicheskom komplekse, ikh nauchnoye i kadrovoye soprovozhdeniye: sb. trudov mezhd. nauchno–prakt. konferentsii[Innovative technologies and projects in the mining and metallurgical complex: collection of works of the International scientific and practical conference], Innovatsionnyye tekhnologii i proyekty v gorno–metallurgicheskom komplekse, ikh nauchnoye i kadrovoye soprovozhdeniye [Innovative technologies and projects in the mining and metallurgical complex], Almaty, Republic of Kazakhstan, 18–19 March 2014, рр. 176–181.
5. Nikolashyn YU.M. and Nikolashyn M.YU. (2002) “Stability of a single–tier dump dumped into a flooded quarry“, Visnyk KTU, no. 81. pp. 31–34.
6. Eberhardt E. (2003) “Rock slope stability analysis – utilization of advanced numerical techniques“, University of British Columbia, 41 p.
7. Nikolashyn YU.M., Vusik O.O., Kebal YA.V. and Domnichev A.V., Kryvyi Rih National University (2013) Sposib vidvaloutvorennia v rezhymi deformatsii porid [The method of overburden dump formation in the mode of rock deformation], Kryvyi Rih National University, Kryvyi Rih, UA, Pat. №84929.
8. Nikolashyn YU.M (2014) “Hydrogeomechanical conditions for the formation of an internal dump in a flooded quarry“, Kachestvo mineralnogo syrya. Collection of scientific papers, pp. 192–198.
9. Ministry of Justice of Ukraine (2004) No 1027/9626 Polozhennia pro proektuvannia vnutrishnoho vidvaloutvorennia ta skladuvannia vidkhodiv vyrobnytstva v zalizorudnykh i fliusovykh karierakh [No 1027/9626Regulations on the design of internal damping and the folding of incoming vibrations in ore–mining and fluxing chambers], Mineral, Dnipro, Ukraine.
10. Antonenko L.K. and Zoteev V.G. (1999) “Problems of processing and burial of mining and metallurgical production wastes“, Gorniy Zhurnal, no. 2. pp 70–72.
11. Sakantsev G.G. (2008) “Resource–saving technologies in the development of ore deposits using mined–out space“, Gorniy informatsionno–annaliticheskiy byuleten, no. 8. P 226–234.
About authors:
Imashev Askar, Candidate of Technical Sciences (Ph.D), Associate Professor, Head in Department of Development of Mineral Deposits, Abylkas Saginov Karaganda Technical University, Karaganda, Republic of Kazakhstan, This email address is being protected from spambots. You need JavaScript enabled to view it.
Kebal Yaroslav, Маster of Science, Chief Project Engineer, KAI Group of Companies, Kryvyi Rih, Ukraine, This email address is being protected from spambots. You need JavaScript enabled to view it.
Kebal Alina, Маster of Science, Desing Engineer, KAI Group of Companies, Kryvyi Rih, Ukraine, This email address is being protected from spambots. You need JavaScript enabled to view it.