Full text available

26. MODELING OF THE COAL-SLIME COKING PROCESSES
27. RATIONAL USAGE OF VISCOUS FLUID HYDRODYNAMICS NEAR THE SEPARATOR WALL
28. STABILITY OF THE LIQUID BRIDGE BETWEEN TWO SURFACES
29. STUDYING OF MINERAL INPUT DEHYDRATION BY MEANS OF LOW-FREQUENCY SOUND FLUCTUATIONS ON THE FIXED SIFTING SURFACE
30. HYDROELASTIC OSCILLATIONS OF A SPHERICAL SHELL FILLED WITH FLUID
31. EFFECTIVENESS OF THERMAL SCHEMES OF THE MINE ENERGY-COMPLEXES DESIGNED ON PRINCIPLE OF STEAM-TURBINE COGENERATION
32. METHOD TO CALCULATE ULTIMATE STRENGTH OF THE ROCK SAMPLES AT TRIAXIAL COMPRESSION
33. ABOUT A MODEL OF CHAMBERED CAVITY FORMED BY PLASMA HEAT GENERATOR
34. STUDYING OF PARAMETERS OF SUPPORTS AND STATE OF PREPARATORY ROADWAY SIDES
35. BUILDING OF PREPARATORY ROADWAYS WITH THE ROOF BOLTING
36. IMPROVEMENT OF STABILITY OF FILLING MASS MADE OF SOLIDIFYING BACKFILL IN THE PROCESS OF THE ORE MINING IN THE DEEP HORIZONES
37. SEISMIC-AND-ACOUSTIC CONTROL OF THE MASSIF FRACTURE DYNAMICS IN ZONES OF RAPTURE DISLOCATIONS BY MEANS OF MODELS WITH EQUIVALENT MATERIALS
38. IMPROVEMENT OF UNDERGROUND CONVEYER OPERATING EFFECTIVENESS BY PREVENTING THE BELTS FROM TRANSVERSAL SLIDING-OFF
39. RESULTS OF TESTING A WELL SUCKER-ROD PUMPING UNIT WITH THE HELP OF SPECIALLY DESIGNED MOBILE CONTROLSYSTEM
40. SPECIFYING OF BRAKING MODE PARAMETERS OF THE MOBILE HOISTING UNIT
41. DETERMINATION OF DESIGN PARAMETERS FOR THE LEVER ROLL GUIDES IN THE MINE SKIPS IN THE SHAFTS WITH BROKEN GEOMETRY
42. INFLUENCE OF EXTRACTION FIELD DIVIDED WITH THE MINE TUNNELS ON THE STOPING OPERATIONS
43. ASSESSMENT OF THE COAL-PRODUCTION PROJECT SENSITIVITY TO THE GEOMECHANIC FACTORS OF RISK
44. IMPACT OF HOISTING VELOCITY PARAMETERS AND WEIGHT ECCENTRICITY ON THE SYSTEM DYNAMICS IN THE MINING SHAFTS