Peregudov Iu.V., Peregudov V.V. Validation of the quarrying technology with involved undermined pit walls
- Details
- Parent Category: Geo-Technical Mechanics, 2016
- Category: Geo-Technical Mechanics, 2016, Issue 129
Geoteh. meh. 2016, 129, 92-97
VALIDATION OF THE QUARRYING TECHNOLOGY WITH INVOLVED UNDERMINED PIT WALLS
1Peregudov Iu.V., 1Peregudov V.V.
1SE «SPI «Krivbassproekt»
UDC 622.271.33: 622.275
Abstract. Objective of the research is to study possibility to involve into quarrying operations those mineral resources, which are located in zone of possible funnel formation. Analysis of the current iron-ore market state shows that in order to improve competitiveness of domestic enterprises it is necessary to involve additional reserves of minerals, which were previous-ly lost during the underground mining operations. It is recommended to apply technology of safety mining of these areas by filling them with the crushed rocks taken from the surface of the quarry benches. Theoretical laws of the dry crushed rocks passing through the stowing wells are described. The proposed technological solutions show that it is possible to involve into quarrying oppera-tions additionally 30 millions of iron ore in conditions of the CGOK Company’s quarry.
Keywords: open pit, underground cavities, joint development.
REFERENCES
1. Pyzhik, Nikolay and Grigoryev, Yulian (2015), “Dry raw material technogenic deposits formation and development technique”, Metallurgical and Mining Industry, no. 3, pp. 298–302.
2. Pikilnyak, A. (2015), “Adaptive control system of the iron ore flotation using a control action based on high-energy ultrasound”, Metallurgical and Mining Industry, no. 2, pp. 27-30.
3. Baron, L.I. (1964), Harakteristiki trenya gornykh porod [Characteristics of rock friction], Nauka, Moscow, USSR.
4. Babayants, G. M. (1964), “The degree of accuracy in determining ore lumpiness by fotometric method with a point counting”, Mining Journal, no. 4, pp. 85-89.
5. Peregudov, V.V. et al. (2007), Analiz vliyaniya vzryvnykh rabot s ispolzovaniem emonita na kachestvo podgotovki zheleznoy rudy dlya pererabotki na rudoobogatitelnoy fabrike: otchet o NIR [Analysis of the impact of blasting using of emonite on the quality of the preparation of iron ore to be processed at ore-dressing factory: Report of research ], Kryvoy Ryh national university, Kryvoi Rog, Ukraine.
6. Grebeniuk, V.A., Pyzhyanova, Y.S and Erofeeva, I.E. (ed.) (1983), Spravochnik po gornorudnomu delu [Mining Handbook], Nedra, Moscow, USSR.
7. Dey, V.G. (2008), “Drilling rig "Rhino" for the rising tunneling openings”, Mining Week, pp. 132-136.
About the authors:
Peregudov Iurii Vladimirovich, Candidate of Technical Sciences (Ph.D), Head Of Group In The Mining Department In Project Institute Krivbassproect, Kryvyi Ryh, Ukraine, This email address is being protected from spambots. You need JavaScript enabled to view it. .
Peregudov Volodymyr Vladimirovich, Candidate of Technical Sciences (Ph.D), Project Institute Krivbassproect, Kryvyi Ryh, Ukraine, This email address is being protected from spambots. You need JavaScript enabled to view it. .