Stupnik N.I., Kalinichenko V.O., Kalinіchenko O. V., Pysmennyi S.V., Fedko M.B. Simulation of the stress-strain state of the rocks at the “gigant glubokaya” underground mine when applying a consolidating backfill technology


Geoteh. meh. 2017, 135, 229-238

SIMULATION OF THE STRESS-STRAIN STATE OF THE ROCKS AT THE “GIGANT GLUBOKAYA” UNDERGROUND MINE WHEN APPLYING A CONSOLIDATING BACKFILL TECHNOLOGY
  Stupnik N.I., Kalinichenko V.O., Kalinіchenko O. V., Pysmennyi S.V., Fedko M.B. 
SHEI “Kryviy Rih NU”

UDC [622.831:622.273.217.4:539.3].001.57

Abstract. The paper presents results of the research and solution of practical task of defining stress-strain state of the massif in conditions of the “Gigant-Glubokaya” underground mine at the PJSC “CGOK” with the help of special software. The research was conducted in the site of 2.1 km long along the strike and 900 m deep. All the calculations have been performed on the basis of Ansys 16.0. The simulation was made for two cases: empty dead stopes and stopes filled with consolidating fillers. It is defined that with empty stopes level of the daylight surface subsidence is rather significant, and it is unacceptable for residential development and urban infrastructure. However, the curvature radius of such displacements develops quite small movements not critical for territories with dacha (country house) or garage communities. Use of consolidating filler in the backfilling dead stopes was proved for decreasing stress in the massif and preserving the surface ground. The simulation results possess high convergence to instrumental observation data. This allows to conclude that the developed model is adequate to the mining and geological conditions of Kryvyi Rih basin and can be used for simulating stress-strain state of the massif and forecasting further development of processes in rocks during underground mining operations.
Keywords: stress-strain state, massif, strain, stress.

REFERENCES

1. Stupnik, N.and Kalinichenko V. (2012), "Parameters of shear zone and methods of their conditions control at underground mining of steep-dipping iron ore deposits in Kryvyi Rig basin" / N. Stupnik., V. Kalinichenko // Geomechanical Processes During Underground Mining. School of Underground Mining. – Dnipropetrovsk, 2012. – рр 15-19.

2. Stupnik, N.I., Kalinuichsnko, O.V. and Kalinichenko, V.O. (2012), "Еconomsc estimation risks of
possible geo-mechanical violations of daily surface in the fields of the Krivbass mines", Scientific
announcer of the National mining university, no. 6, pp. 126-130.

3. Stupnik, N., Kalinichenko, V., Kolosov, V., Pismennyy, V. and Fedko, M. (2014), "Testing complexstructural magnetite quartzite deposits chamber system design theme", Metallurgical and mining industry., No.2., pp 89-93.

4. Stupnik, N., Kalinichenko, V., Kolosov, V. [and others] (2014), "Modeling of stopes in soft ores during ore mining", Metallurgical and mining industry,- No.3. – pp 32-36.

5. http://www.0564.ua.

6. Kalinichenko, O.V. (2010), "Determination essences of concept of the complex system of economic evaluation of geo-mechanical risks", Scientific announcer of the National mining university, no. 3., pp. 100-102.

7. Buskov, E. (1970), "The calculation of stress intensity factors using the finite element method with cracked elements", Int. J.Fract. Mech,., no. 6, pp. 159-167.

8. Tracey, D.M. (`1971), "Finite elements for determination of crack tip elastic stress, intensity factors", Eng. Fract. Mech., no.3, pp. 255-265.

9. Walsh, P.F. (1971), "The computation of stress intensity factors by a special finite element technique", Int. J. Solids and Struct , no. 7, - pp. 1333-1342.

10. Levy, N., Marcal, P., Ostergren, W. and Rice J. (1971), "Small scale yielding near a crack in plane strain A finiteelement analysis", Int. J. Fract. Mech., no. 1, -pp. 143-156.

11. Kulykovska, O.Ye. (2004), "Сomparison of modern motions of earthly surface of the Kryvyi Rih
basin pool with the features of structure of his geological environment", Announcer of the Kryvyi Rih technical university, no. 24. – С. 52-57.

12. Kulykovska, O.Ye. and Sidorenko, V.D. (2010), "Vertical displacements of reperov of geodynamical ground of on territory of the exploited iron-ore deposit", Development of ore deposits., Krivoy Rog, no. 93., pp. 81-86.

13. Kulykovska, O.Ye. (2012), "Research process of change of surface and objects at underground
development of the deposit PAS «Yevraz Sukha Balrka», Announcer of the Kryvyi Rih national university, no. 30, pp. 30-34.

14. Kulykovska, O.Ye. (2012), "Conceptual bases of the surveyor monitoring of the safe functioning of mining regions", Abstract of D. Sc. dissertatson, SHEI "KrNU", Krivoy Rog, UA.

15. SNyP ІІ-8-78. Build norms and governed. (1979), Part 2. Norms of planning., Ch. 8. Buildings and buildings the on earned additionally territories, Stroyyzdat, Moscow, SU.

About the authors:

Stupnik Mykola Ivanovych, Doctor of Technical Sciences (D.Sc.), Professor, Rector of State Higher Educational Institution “Kryviy Rih National University” (SHEI “Kryviy Rih NU”), Professor in the Department of Underground Mining Deposits of Mineral Resources in the State Higher Educa-tional Institution “Kryviy Rih National University” (SHEI “Kryviy Rih NU”), Kpyvyi Rih, Ukraine

Kalinichenko Vsevolod Oleksandrovych, Doctor of Technical Sciences (D.Sc.), Professor, Head of the Department of Underground Mining Deposits of Mineral Resources in the State Higher Educa-tional Institution “Kryviy Rih National University” (SHEI “Kryviy Rih NU”), Kpyvyi Rih, Ukraine, This email address is being protected from spambots. You need JavaScript enabled to view it.

Kalinchenko Olena Vsevolodivna, Candidate of Economical Sciences (Ph.D.), Associate Pro-fessor, Associate Professor in the Department of Underground Mining Deposits of Mineral Resources in the State Higher Educational Institution “Kryviy Rih National University” (SHEI “Kryviy Rih NU”), Kpyvyi Rih, Ukraine

Pysmennyi Sergiy Vasylyovych, Candidate of Technical Sciences (Ph.D.), Associate Professor,
Associate Professor in the Department of Underground Mining Deposits of Mineral Resources in the State Higher Educational Institution “Kryviy Rih National University” (SHEI “Kryviy Rih NU”), Kpyvyi Rih, Ukraine, This email address is being protected from spambots. You need JavaScript enabled to view it.

Fedko Mykhaylo Borysovych, Candidate of Technical Sciences (Ph.D.), Associate Professor, Associate Professor in the Department of Underground Mining Deposits of Mineral Resources in the State Higher Educational Institution “Kryviy Rih National University” (SHEI “Kryviy Rih NU”), Kpyvyi Rih, Ukraine