Bulat A.F., Chetverik M.S. Mining, power engineering and ecological problems
|
Anisimov O.A. Determination of maximum height of a face with blasted rocks for front wheel loader easy operation
|
Babiy K.V., Kosenko V.I., Ikol А.А. Processing of lumpy rock mass in the iron ore quarries
|
Bilogub O. I.? Soloviev G. I., Bachurin L. L., Sergienko A. I., Fedorenko M. V., Kozir S. V. Development of criterion for formation of roof rocks falling in the coal faces
|
Gvinianidze D.V., Nazarenko V.A., Kuchin A.S. Studies of boundary angel parameters in the western Donbass mines
|
Grygoriev Yu.I. Analysis of theory and methodology for evaluating combined man-made and natural deposits mining
|
Dyakun I.L., Kozar I.Y. Energy efficiency of the co-generation schemes in the mine energetic complex
|
Koshka A.G., Yavors’kyy A.V., Malashkevych D.S., Yavors’kaya E.A. Mining of thin and extra thin seams with waste rocks left in the mine
|
Kuzmenko A.M., Petlyovany M.V. Situation and trends of stowing development in underground mines of Ukraine
|
Lavrik M.O., Pavlichenko A.V. Analysis of ecological condition and rate of salinity of soils in western Donbass
|
Maksymova E.O., Ganushevych K.A. Sai K.S. Development of gas hydrate technologies – the way to gaining an additional energy resource in Ukraine
|
Pavlychenko A.V., Kovalenko A.A. Environmental hazard of waste dumps of abandoned coal mines
|
Semenenko E.V., Kirichko S.N. Method of hydraulic slope calculation for stream of pulp with paste concentration
|
Sergienko V.N., Аmelin V.A. Vasiljev B.V. Vojtovich Т.G. Аmelina L.V. To the estimate of long-term stability of the roof coal in tunnels of gypsum mines in zones with geological disturbances
|
Simonenko V.I., Yaroshik N.I. Rational mining-loading-hauling machines in the crushed-rock open pit with mobile complexes
|
Sofiiskyi K.K., Gavrylov V.I., Vlasenko V.V. Gas-saturation reduction in the flat coal seam i31 by applying hydrodynamic impact
|
Stolbchenko Ye. V. Determination of methane concentration in the stream outgoing from the blind drift
|
Tereshchenko V.V., Shvets D.V. Future-oriented development of resource base by opencast method of mining in quarry of the public joint-stock company "InGOK"
|
Turchin Y.Y. Study of ground water impact on the rate of pit levels stripping
|
Khalymendyk YU.М., Bryi A.V., Baryshnikov А.S. Supporting of mine roadway with rope bolts under conditions of soft walls
|
Chetverik M.S., Voron Ye.A. Levchenko Ye.S. Peretyatko G.V. Technological schemes for mining in caving zones at stripping steep ore deposits
|
Shevchenko V.G., Zaitsev M.S. Simulation of safety mining operations control with the help of visual monitoring of the tunnel and equipment state
|
Shmatovskiy L.D., Kolomiets A.N., Zaitsev M.S. Tynyna S.V. Method for computing parameters of grouting rock self-stress
|
Iyaroshevich I. N. Podrezenko I. N., Pigulevsij P. I. Optimum conditions for water intake at deepening of severnyy quarry, Komsomolsk city, to the (-50 m) horizon
|